PROJECT SUMMARY:
The project is a new replacement facility for Ardenwald Elementary School, to service 550 students in kindergarten through sixth grade in a single building.   The existing school currently serves 314 students in multiple single story buildings. The new school is a single two- story building. The building will be 64.300 GSF, not including the covered play area. 

The new Ardenwald has been completed and students started attending classes on September 8, 2009.

 

PROJECT TEAM: 
Capital Proects Manager: Garry Kryszak, North Clackamas School District
 Project Manager:  Craig Markus, Cornerstone Management Group
Architect:  Mahlum Architects
Contractor:  P&C Construction



PROJECT SCHEDULE:
Start Construction June 16, 2007
Completion Date July 2009

PROJECT SCHEDULE
 


UPCOMING ACTIVITIES :
  • Project Complete


PROJECT PHOTOS
     
     

     
     
     
Paving Parking Lot 8/09 Parent Drop Off Parking Lot 8/09 Reader Board and Sod Field 8/09
Front Entrance 8/09  Front Entrance 8/09
Landscaping 8/09
Playground 8/09
Playground 8/09
Piping 8/09
 Paving 8/09
Sidewalk 8/09
Paving  8/09
Bus Loop Prep 7/09 Bus Loop Paving 7/09 Paved Bus Loop 7/09
View from 36th and Wake 7-6-09 What's Left of Old Building 7-6-09 Bus Loop Taking Shape 7-6-09
 Demo of Annex 6/09
 Demo 6/09
 Demo 6/09
Classroom Demo 6/09   New Bus Stop taking Shape 6/09
 Staff at New Bldg. Main Office 6/09
 
 Gym and Bleachers 6/09
Front Entry 6/09 Ardenwald Saying Good-bye  6/09
 Old Library 6/09
 Old Gym 6/09
Ardenwald Gym Flooring 6/09
 Front Lobby 6/09
 Front Entry 6/09
 Aerial of Ardenwald 5/09

 
Aerial of Ardenwald 5/09   Front Walkway Prep for Sidewalk 5/09
 Ardenwald Stage 5/09
 
 Front Entry 5/09
Old Cover Play Removed 4/09 Classroom 4/09
Courtyard 4/09 Classroom with Flooring 4/09 Front Entry 4/09
Front of Building from Roswell St. 4/09 South Side Classrooms 4/09 Classroom Cubbies 4/09
 Shared Space Casework 4/09
Covered Play Area 3/09 South Side of Classrooms 3/09
Finish Classroom Sanding 3/09 Front Entry 3/09 Principal, Sheila Shaw at Admin Desk 3/09
Front Exterior Work in Progress 3/09 Interior Walls with Ductwork 3/09 Interior Walls 3/09
Courtyard Painted 2/09
1st Floor Gyp Board Installation 2/09
2nd Floor Looking at Stairs 2/09
2/09 2/09 2/09

2/09  2nd Floor Stairs at Media Center 2/09 East Side of Building 2/09
Covered Play and Back Canopy 2/09
Principal in her Office 1/09
 Principal in Front Lobby 1/09
Ardenwald Principal in 1st Floor Classroom  Ardenwald Courtyard 1/09 1st Floor Interior Framing 1/09
1st Floor Framing 1/09
Getting Ready for 2nd Concrete Pour 1/09
North Face of Building at Roswell 1/09
Front Entry 12/08 12/08 12/08
Aerial Photo 12/08 Aerial Photo 12/08 Aerial Photo 12/08
Arenwald from Roswell St. 12/08
Ardenwald from Roswell St. 12/08
Ardenwald Classroom Steel Framing 12/08
Mechanical Well 11/08
Front Entry 11/08
Front Lobby 11/08
 East Classroom Wing 11/08
Ardenwald Courtyard 10/08
Ardenwald Roof Framing 10/08
 Roof Structure Being Installed 10/08
 Ardenwald Gym
Aerial View of Ardenwald 10/08
Tilt Up Panel 71,000 lbs. Tilt Up Panel Tilt Up Panel
Tilt Up Panels Tilt Up Panels Principal Sheila Shaw at Front Door

Tilt Panels for 3rd Layer 9/08

Pouring tilt panels

 

Pouring tilt panels Tilt panel formwork with rainbow

 Pouring tilt panels

36th Street Paved w/ 1st Lift

Slab Pour

Tilt panel with rebar

 Wake Stree Sidewalk

Site Grading

Site Work