| Paving Parking Lot 8/09 |
Parent Drop Off Parking Lot 8/09 |
Reader Board and Sod Field 8/09 |
 |
 |
 |
| Front Entrance 8/09 |
Front Entrance 8/09
|
Landscaping 8/09
|
 |
 |
 |
Playground 8/09
|
Playground 8/09
|
Piping 8/09
|
 |
 |
 |
Paving 8/09
|
Sidewalk 8/09
|
Paving 8/09
|
 |
 |
 |
| Bus Loop Prep 7/09 |
Bus Loop Paving 7/09 |
Paved Bus Loop 7/09 |
 |
 |
 |
| View from 36th and Wake 7-6-09 |
What's Left of Old Building 7-6-09 |
Bus Loop Taking Shape 7-6-09 |
 |
 |
 |
Demo of Annex 6/09
|
Demo 6/09
|
Demo 6/09
|
 |
 |
 |
| Classroom Demo 6/09 |
New Bus Stop taking Shape 6/09
|
Staff at New Bldg. Main Office 6/09
|
 |
 |
 |
Gym and Bleachers 6/09
|
Front Entry 6/09 |
Ardenwald Saying Good-bye 6/09 |
 |
 |
 |
Old Library 6/09
|
Old Gym 6/09
|
Ardenwald Gym Flooring 6/09 |
 |
 |
 |
Front Lobby 6/09
|
Front Entry 6/09
|
Aerial of Ardenwald 5/09
|

|
 |
 |
| Aerial of Ardenwald 5/09 |
Front Walkway Prep for Sidewalk 5/09
|
Ardenwald Stage 5/09
|
 |
 |
 |
Front Entry 5/09
|
Old Cover Play Removed 4/09 |
Classroom 4/09 |
 |
 |
 |
| Courtyard 4/09 |
Classroom with Flooring 4/09 |
Front Entry 4/09 |
 |
 |
 |
| Front of Building from Roswell St. 4/09 |
South Side Classrooms 4/09 |
Classroom Cubbies 4/09 |
 |
 |
 |
Shared Space Casework 4/09
|
Covered Play Area 3/09 |
South Side of Classrooms 3/09 |
 |
 |
 |
| Finish Classroom Sanding 3/09 |
Front Entry 3/09 |
Principal, Sheila Shaw at Admin Desk 3/09 |
 |
 |
 |
| Front Exterior Work in Progress 3/09 |
Interior Walls with Ductwork 3/09 |
Interior Walls 3/09 |
 |
 |
 |
| Courtyard Painted 2/09 |
1st Floor Gyp Board Installation 2/09
|
2nd Floor Looking at Stairs 2/09
|
 |
 |
 |
| 2/09 |
2/09 |
2/09 |

|
 |
 |
| 2/09 |
2nd Floor Stairs at Media Center 2/09 |
East Side of Building 2/09 |
 |
 |
 |
Covered Play and Back Canopy 2/09
|
Principal in her Office 1/09
|
Principal in Front Lobby 1/09
|
 |
 |
 |
| Ardenwald Principal in 1st Floor Classroom |
Ardenwald Courtyard 1/09 |
1st Floor Interior Framing 1/09 |
 |
 |
 |
| 1st Floor Framing 1/09 |
Getting Ready for 2nd Concrete Pour 1/09
|
North Face of Building at Roswell 1/09 |
 |
 |
 |
| Front Entry 12/08 |
12/08 |
12/08 |
 |
 |
 |
| Aerial Photo 12/08 |
Aerial Photo 12/08 |
Aerial Photo 12/08 |
 |
 |
 |
|
Arenwald from Roswell St. 12/08
|
Ardenwald from Roswell St. 12/08
|
Ardenwald Classroom Steel Framing 12/08
|
 |
 |
 |
Mechanical Well 11/08
|
Front Entry 11/08
|
Front Lobby 11/08
|
 |
 |
 |
East Classroom Wing 11/08
|
Ardenwald Courtyard 10/08 |
Ardenwald Roof Framing 10/08
|
 |
 |
 |
Roof Structure Being Installed 10/08
|
Ardenwald Gym
|
Aerial View of Ardenwald 10/08
|
 |
 |
 |
| Tilt Up Panel 71,000 lbs. |
Tilt Up Panel |
Tilt Up Panel |
 |
 |
 |
| Tilt Up Panels |
Tilt Up Panels |
Principal Sheila Shaw at Front Door |
 |

|
 |
|
Tilt Panels for 3rd Layer 9/08
|
Pouring tilt panels
|
|
 |
 |

|
| Pouring tilt panels |
Tilt panel formwork with rainbow |
Pouring tilt panels
|
 |
 |
 |
|
36th Street Paved w/ 1st Lift
|
Slab Pour
|
Tilt panel with rebar |
 |
 |
 |
|
Wake Stree Sidewalk
|
Site Grading
|
Site Work
|
 |
 |
 |