Milwaukie High School


Last Updated on 2-5-10

 PROJECT SUMMARY:

There are three projects at the Mliwaukie High School:
 
1. Milwaukie High School Renovations and Additions
 
 

Milwaukie High Renovations & Additions

PROJECT SUMMARY: 

Work was completed on major upgrades and additions at Milwaukie High School in April, 2009.  The Auditorium received major upgrades including:
  • New lobby
  • New black box theater
  • Remodeled make-up Room
  • Remodeled Band Room
  • Two story addition with a dance studio on the first floor and arts classrooms on the second floor. 
  • New ceiling, house lights, stage rigging, front curtain, sound  booth in main auditorium
  • The girl's locker room was completely renovated and three new team rooms were added.  This portion of the project was completed in October, 2008.
  • New restrooms were added at the gym lobby with new access stairway constructed to give easier access to the locker rooms. This portion of the project was completed in December of 2008.
  • The wrestling room floor has been replaced and new wall padding installed.
  • The new track storage building was constructed in the Summer of 2009.
  • The track was reconstructed to a new 8 lane facility, the stadium field upgraded to all weather turf and the stadium filed lights were replaced.  This work was completed in September 2008.
  • During the summer of 2007 the old gym was re-roofed and new boilers were installed in the main building.

PROJECT TEAM:
Capital Project Manager: Garry Kryszak, Clackamas School District
 Project Manager: Craig Markus, Cornerstone Management Group
 Architect: Mahlum Architects
 Contractor:  Emerick Construction Company
 Engineer:  

PROJECT SCHEDULE:
 Start Construction:  June 15, 2008
 Construction Complete:   August 31, 2009

PROJECT SCHEDULE
 

UPCOMING ACTIVITIES :
  • All work at Milwaukie High School has been completed.

 

Capital Project Manager: Garry Kryszak, Clackamas School District
 Project Manager:  Dan Golden
 Architect:  
 Contractor:  TBD
 Engineer:  SDC

PROJECT SCHEDULE:
 Start Construction:  June 25, 2007
 Construction Complete:  August 31, 2007

PROJECT SCHEDULE
 


UPCOMING ACTIVITIES :
  • Complete

PROJECT PHOTOS:
 

Milwaukie High School Roofing Project:


PROJECT TEAM:

Capital Project Manager: Garry Kryszak, Clackamas School District
 Project Manager: Tony Walters, Milestead & Associates
 Architect:  BB&L
 Contractor:  McDonald, Snyder, ABC Griffith
 Engineer:  N/A

PROJECT SCHEDULE:
 Start Construction: June 20, 2007
 Construction Complete:  August 31, 2007

PROJECT SCHEDULE
 

UPCOMING ACTIVITIES :
  • Complete


PROJECT PHOTOS:
   

PROJECT PHOTOS:
     
    Track Storage Building 8/09
 Track Storage Building 8/09
 Track Storage Building 7/09
MHS Track Storage Building Slab 7/09
 Front Entry New Concrete Work Prep 6/09
 New Wrestling Floor 6/09
 Fine Arts Front Lobby 4/09
 Fine Arts Dance Studio 4/09
 Principal in lobby overlooking dance studio 4/09
Fine Arts Front 4/09
Fine Arts Inside Front Lobby 4/09 Fine Arts Pottery Room 4/09 Fine Arts Drawing Room 4/09
 Fine Arts Front Lobby 4/09
 Fine Arts Front Lobby 4/09
Fine Arts Lobby Interior 4/09
 Fine Arts Lobby Interior 4/09
Fine Arts Looking Down Stairs to Lobby 3/09 Fine Arts Front Entry 3/09
Front of Fine Arts 3/09
Front of Fine Arts 3/09 Auditorium with New Ceiling 3/09
 Front of Fine Arts Building 2/09
 Auditorium with New Ceiling and Paint 2/09
Fine Arts Lobby 2/09
Fine Arts Front Entry 2/09
Fine Arts Front Lobby 1/09
Framing at Dance Studio 1/09
 Black Box Interior Work 1/09
Gym Restroom Stairwell 1/09
Gym Restroom at Weight Room Level 1/09
 Gym Restroom at Gym Level 1/09 Gym Restrooms 1/09

MHS Fine Arts North side, lower level is Dance, Upper is Drawing and Pottery 12/08

MHS Fine Arts framing in the lobby 12/08 MHS Gym RR addition hallway MHS gym RR addition restroom tile work 12/08
MHS Gym RR addition exterior 12/08 Fine Arts Building 12/08 Fine Arts Building 12/08
 Gym Restroom Exterior 12/08
Girls Locker Room 11/08 Girls Locker Room 11/08
   Girls Locker Room 11/08
 Girls Locker Room 11/08
Fine Arts Front 11/08 Fine Arts Front 11/08
 Gym Restroom Addition 11/08
Black Box Theatre 11/08
Coaches Office in Locker Room 11/08
 Girls Locker Room 11/08
 Front Lobby Taking Shape 10/08
Mustang Wall  Work 10/08
Fine Arts Addition 10/08 Gym Restroom 10/08  Girls Locker Room New Showers 10/08
 Gym Restroom
 Fine Arts Foundation 10/08
 Fine Arts Theatre
Black Box Theatre Block Wall Going Up 9/08 Front Lobby at Fine Arts Lower Level  Fine Arts Dance Floor

Fine Arts Building 9/08 Fine Arts Building Black Box Walls 9/08

 Field Turf 8/08

     

Gym  Restroom 8/08

Newly Washed and Painted Exterior

Fine Arts Foundation

Gym Restroom Addition 8/08

Gym Restroom Addition 8/08

Fine Arts Construction 8/08

Fine Arts Addition 7/08

Fine Arts Construction 7/08

Fine Arts Construction 7/08

 

Girls Locker Room Remodel

Girls Locker Room Remodel

 Girls Locker Room Remodel

 Field Turf 4/08
Field Turf 4/08  Field Turf 4/08 
 Field Turf 4/08
 Field Turf 4/08
 Field Turf 4/08
 


















































































































































































































































































Field Turf 04/08




















Milwaukie High School Boiler Replacement:


PROJECT TEAM: