PROJECT DESCRIPTION
|
STATUS
|
MILWAUKIE HIGH ATTENDANCE AREA
|
|
Milwaukie High School
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Paint entire schoool exterior |
Complete |
| Replace roof- 1980 main bldg and industrial arts bldg |
Complete |
| Replace roof-1982 section of gym building |
Complete |
| Exterior stucco restoration |
Complete |
| Renovate 1984 auditorium roof |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Renovate girls locker room heat and ventilation |
Complete |
| Replace two 1949 boilers |
Complete |
| Replace all building steam traps |
Complete |
| Renovate heating system thermostats/ control valves |
Complete |
| Convert heating controls to direct digital system |
Complete |
| Replace all classroom unit ventilators(heating) |
|
| Renovate media center heat/vent system |
Complete |
| Renovate photo copy room heat/vent system |
Complete |
| Replace 1971 auditorium boiler |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
Complete |
| Replace 1963 football field lights and poles |
Complete |
| Upgrade lighting in all areas not previsously completed |
Complete |
| Replace 1975 master intercom paging unit and wiring |
Complete |
| Replace 1960 master clock system |
Complete |
| Replace obsolete stage lighting instruments |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace chalkboards and tackboards |
Complete |
| Replace and upgrade exterior door hardware |
Complete |
| Wrestling room floor replacement |
Complete |
| Clean, replace or repair stage curtains |
Complete |
| Interior finish renovation of the Fine Arts Building |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Repair drainage on Lake Road athletic field |
Complete |
| Re-pave Lake Road parking lot |
Complete |
| Construct storage building on main field |
Complete |
| Facility Improvements (major renovation and repair of aging facilties) |
|
| Gym rest room improvements for disabled access |
Complete |
| Renovate rest rooms in the Art/Tech area |
Complete |
| Renovate upper and lower girls locker rooms |
Complete |
| Provide disabled access to Fine Arts Building |
Complete |
| Provide improved facilities for band, drama, and dance |
Complete |
| |
|
Back to Top
|
|
Rowe Middle School
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
Cmplete |
| Exterior siding and roof horiz. trim board renovation |
Complete |
| Paint entire school exterior |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace all unit ventilators in 1963 portion of bldg. |
Complete |
| Convert heating controls to direct digital system |
Complete |
| Upgrade ventilation in upper gym |
Complete |
| Plumbing fixture renovation in older section rest rooms |
Complete |
| Heat/Vent improvements for counseling office |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade and replace lighting throughout |
Complete |
| Replace and upgrade lighting in old locker rooms |
Complete |
| Replace obsolete dimming equipment on stage |
Complete |
| Install sound system in gym |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
Complete |
| Paint the entire interior of the building |
Complete |
| Replace and upgrade corridor lockers |
Complete |
| Corridor wall finish and tackboard upgrade |
Complete |
| Acoustic treatment for main and upper gyms |
Complete |
| Repair and upgrade exterior door hardware |
Complete |
| Install locks on all rest room doors |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Extend west driveway sidewalk to Lake Road |
Complete |
| Overlay paving behind gym and shop |
|
| Add additional parking on the site |
Complete |
| Construct walkway to Licyntra Dr.(City requirement) |
Complete |
| Construct running track |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Construct additional staff rest rooms |
Complete |
| Construct additional gym and locker room space. |
Complete |
| Construct choral music room |
Complete |
| Renovate Front Entrance |
Complete |
| Remodel existing locker rooms |
Complete |
| Renovate kitchen |
Complete |
| Install corridor gates for night security and safety |
Complete |
| |
|
Back to Top
|
|
Ardenwald Elementary
|
|
| Replace Building on site |
Complete |
| |
|
Back to Top
|
|
Campbell Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace rotted windows/walls in south facing units |
Complete |
| Replace exterior doors and hardware |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace worn out classroom furnaces (total 7) |
Complete |
| Replace boiler in Unit A |
Complete |
| Renovate and upgrade plumbing fixtures in all rest rooms |
Complete |
| Install drinking fountains in corridors |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade exterior lighting |
Complete |
| Replace 1975 intercom and clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Paint entire interior of the building |
Complete |
| Replace worn out carpet/flooring throughout building |
Complete |
| Replace sinks/countertops in all classrooms |
Complete |
| Renovate interior finishes and paint the main office |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Repair concrete courtyards and paved walkways |
Complete |
| Renovate upper playground |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Install air conditioning in the computer lab |
Complete |
| Renovate kitchen |
Complete |
| Fill in the stage opening with a permanent wall |
Complete |
| Install bleachers in the gym |
Complete |
| |
|
Back to Top
|
|
Lewelling Elementary
|
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Convert heating controls to direct digital system |
Complete |
| Renovate rest room fixtures |
Complete |
| Replace all classroom sinks |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Renovate and upgrade lighting throughout |
Complete |
| Replace intercom and clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out floor tile throughout entire building |
Complete |
| Replace worn out chalkboards and add tackboards |
Complete |
| Renovate interior corridor wall surfaces with tackboard |
Complete |
| Replace all door hardware and closers |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Landscaping renovation and improvements |
Complete |
| Construct paved walkway to Willow Street |
Complete |
| Resurface tennis courts |
Complete |
| Construct paved jogging path |
Complete |
| Overlay deteriorated play area asphalt paving |
Complete |
| Extend sidewalk at gym overhang by parking area |
Complete |
| Expand irrigation system to central courtyards |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Expand and improve office facilities |
Complete |
| Renovate rest room finishes throughout building |
Complete |
| Renovate kitchen |
Complete |
| Add folding bleachers to the gym |
Complete |
| |
|
Back to Top
|
|
Linwood Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Weatherize the windows |
Complete |
| Paint the entire exterior of the building |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Repair and renovate 1968 heating system components |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Replace 1980 intercom and 1968 clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Paint the entire interior of the building |
Complete |
| Replace worn out chalkboards and add tackboards |
Complete |
| Replace window coverings |
Complete |
| Renovate interior finish of the main corridor |
Complete |
| Replace worn carpeting in 8 classrooms and open areas |
Complete |
| Upgrade and repair exterior door hardware |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Install drainage improvement in the playground area |
Complete |
| Overlay paving in the parking lot |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Media Center addition per the master plan |
Complete |
| Gym addition per the master plan |
Complete |
| Renovate rest room interior finishes and equipment |
Complete |
| Renovate kitchen and loading and access |
Complete |
| Renovate and reconfigure the office area |
Complete |
| |
|
Back to Top
|
|
Milwaukie Elementary/El Puente
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace the 1981 flat section of the roof |
Complete |
| Replace the remaining wood/metal windows |
Complete |
| Replace exterior doors and hardware |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| General upgrade and renovation of old steam heat system |
Complete |
| Upgrade ventilation and heat in multi-purpose room |
Complete |
| Replace all classroom sinks |
Complete |
| Add sinks in four north classrooms |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Improve parking lot security lighting |
Complete |
| Improve lighting under covered play area |
Complete |
| Replace 1978 intercom and clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Paint covered play area ceiling |
Complete |
| Replace stage curtains |
Complete |
| Replace worn out chalkboards and tackboards |
In Progress
|
| Replace window coverings in all rooms |
In Progress
|
| Replace the orginal 1935 wood gym floor |
Complete |
| Replace worn flooring throughout the building |
Complete |
| Replace worn carpet floors in two classrooms |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Upgrade play equipment and play area drainage |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Renovate and expand main office |
Complete |
| Install glass in all classroom doors |
Complete |
| |
|
Back to Top
|
|
Whitcomb Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace windows and doors and weather strip |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Convert heating controls to direct digital system |
Complete |
| Renovate 1958 building heating system and coils |
Complete |
| Provide heat and ventilation to music rooms |
Complete |
| Replace all classroom sinks |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade and replace lighting throughout |
Complete |
| Replace 1982 intercom and clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Flameproof stage curtains |
Complete |
| Replace worn out chalkboards and tackboards |
Complete |
| Complete interior finishes renovation |
Complete |
| Replace worn out folding wall on stage |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Install drainage along east side courtyards |
Complete |
| Repair expansion joints in all concrete patios |
Complete |
| Make repairs to the covered play area, lights paving etc. |
Complete |
| Install drainage for the playground equipment |
Complete |
| Overlay pave east driveway and fire lane |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Upgrade all rest rooms |
Complete |
| Renovate kitchen and serving line |
Complete |
| Install bleachers in the gym |
Complete |
| |
|
Back to Top
|
|
Wichita Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace windows throughout building |
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Install ventilation for offices |
|
| Renovate or replace all steam traps |
|
| Replace radiators with vent fan heat units throughout |
|
| Convert heating controls to direct digital system |
|
| Replace all classroom sinks |
|
| Replace cafeteria hand washing sink |
|
| Improve ventilation in south facing classrooms |
|
| Improve ventilation for the computer lab in basement |
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade the gym PA system |
|
| Replace 1975 intercom and clock system |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace stage curtains |
|
| Replace worn out chalkboards and tackboards |
|
| Replace and upgrade classroom window coverings |
|
| Paint the entire interior of the building |
|
| Add acoustic wall treatment in gym |
|
| Renovate gym floor |
|
| Replace worn out floor covering throughout building |
|
| Upgrade and repair exterior door hardware |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Renovate parking and bus loading areas |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Covered play area expansion |
|
| Renovate kitchen |
|
| Renovate and reconfigure the office area |
|
| |
|
Back to Top
|
|
REX PUTNAM HIGH ATTENDANCE AREA
|
|
Rex Putnam High School
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Paint the entire exterior of the building |
Scheduled for 2010
|
| Upgrade windows for energy efficieny and comfort |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Upgrade heating and cooling controls in Career Center |
Complete |
| Convert heating controls to direct digital system |
Complete |
| Replace heat unit ventilators in all the perimeter classrooms |
Complete |
| Renovate wrestling room heat/ventilation system |
Complete |
| Repair main gym flooring at drinking fountains |
Complete |
| Replace deteriorated gas piping to science rooms |
Complete |
| Replace drinking fountains throughout building |
Complete |
| Reinsulate all trench and tunnel piping |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Replace 1967 football field lights and poles |
Complete |
| Exterior lighting upgrade |
Complete |
| Replace obsolete electrical panels |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
Complete |
| Replace countertops in all classrooms |
Complete |
| Paint entire interior and renovate all and tackboard surfaces |
Complete |
| Replace original 1963 corridor lockers |
Complete |
| Renovate the corridors with new tackboards and finishes |
Complete |
| Replace wrestling room wall padding |
Complete |
| Replace worn out flooring throughout the entire building |
Complete |
| Sand and seal upper gym floor |
Complete |
| Replace obsolete door hardware and doors |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Major repair to stadium structure and bleachers |
Complete |
| Renovate and improve front courtyard |
Complete |
| Renovate and improve central courtyard |
Complete |
| Terrace and landscape east bank |
Complete |
| Drill well and connect to field irrigation systems |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Renovate the cafeteria and the kitchen. Enlarge to a commons area with adequate capacity |
Complete |
| Enlarge and reconfigure main front office and entrance |
Complete |
| Renovate rest rooms throughout building |
Complete |
| Construct stairs and lift to auditorium storage area |
Complete |
| Science room renovation (6 rooms total) |
Complete |
| Media Center Upgrades and Renovations |
Complete |
| |
|
Back to Top
|
|
Alder Creek Middle School
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Paint the entire exterior of the building |
|
| Replace and upgrade exterior doors and hardware |
|
| Replace windows in classrooms |
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Renovate heat/ventilation in support services offices |
|
| Repair and/or upgrade all steam traps |
|
| Renovate or replace all steam control valves |
|
| Replace 1957 heat/vent units in perimeter classrooms |
|
| Renovate or upgrade 1957 heating units in the gym |
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Renovate and upgrade lighting in locker rooms |
|
| Upgrade 1977 clock and intercom system |
|
| Replace parking lot lighting poles and fixtures |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out floor covering in all areas of the buildling not done in 2001 |
|
| Renovate wall surfaces in three south cross corridors |
|
| Correct tackboard "dimpling" problem |
|
| Replace flooring in south corridor rooms |
|
| Sink/counter replacement - three science rooms |
|
| Replace PE lockers. |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Construct entrance vestibule at the main office area |
|
| Renovate all of the rest rooms in the entire building |
|
| Renovate and repair south wing classrooms |
|
| Add skylights for common areas per original plans |
|
| Construct rest rooms for gym use and "E" corridor |
|
| Kitchen renovation |
|
| |
|
Back to Top
|
|
Bilquist Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
Complete |
| Repair and paint west wall of old covered play area |
Complete |
| Replace exterior windows with energy efficient |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
Upgrade ventilation in the old gym/cafeteria
|
Complete |
| Upgrade rest room ventilation throughout |
Complete |
| Convert heating controls to direct digital system |
Complete |
| Replace all classroom heat/vent units |
Complete |
| Replace plumbing fixtures in all rest rooms |
Complete |
| Replace all classroom sinks |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Replace 1978 intercom and clock system |
Complete |
| Improve site lighting |
Complete |
| Renovate and upgrade light fixtures throughout |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
Complete |
| Replace stage curtains |
Complete |
| Replace media center circulation desk |
Complete |
| Complete interior finish renovation and wood refinishing |
Complete |
| Renovate corridor wall surfaces and display areas |
Complete |
| Replace worn out floor coverings throughout building |
Complete |
| Replace the worn out carpet in library and office |
Complete |
| Upgrade and repair exterior door hardware |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Grade and reseed the upper playground area |
Complete |
| Paving overlay for all hard surface play areas |
Complete |
| Improve drainage and pavement on upper play area |
Complete |
| Pave and renovate gravel parking and drop off zone |
Complete |
| Improve parking lot and entrance signage |
Complete |
| Facility Improvements (major renovation and repair of aging faciltiies) |
|
| Renovate kitchen |
Complete |
| Office and staff room renovation and expansion |
Complete |
| General Renovations |
Complete |
| Install bleachers in the gym |
Complete |
| Replacement School Facilities |
Complete |
| |
|
Back to Top
|
|
Concord Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace eight exterior door sets |
|
| Replace the windows in the gym |
|
| Replace north facing classroom windows |
|
| Replace the 1977 roof on the east side of the building |
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace heat/vent units and radiators throughout building |
|
| Replace both 1936 orginal boilers |
|
| Renovate and upgrade steam traps |
|
| Convert heating controls to direct digital system |
|
| Replace all classroom and service sinks |
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade site lighting |
|
| Upgrade and replace lighting throughout |
|
| Replace 1976 intercom and clock system |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace stage curtains |
|
| Replace worn out chalkboards and tackboards |
|
| Classroom cabinet renovation |
|
| Add tackboard surfaces for interior corridor walls |
|
| Paint the interior of the entire building |
|
| Renovate and restore gym floor |
|
| Upgrade and repair exterior door hardware |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Replace deteriorating rock retaining wall |
|
| Renovate siding of covered play |
|
| General improvement and repairs to fields-drainage |
|
| Renovate and repair the north parking lot |
|
| Replace bad sidewalk around the building |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Install gates to secure gym for night and weekend use |
|
| Expand computer lab |
|
| Renovate kitchen and cafeteria |
|
| Office area renovation and reconfigure |
|
| |
|
Back to Top
|
|
Oak Grove Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Repair and replace the 1979 old building roof |
|
| Install sun screens on south facing classrooms |
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace sinks in all older building classrooms |
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade and replace lighting in older section |
|
| Add electrical outlets in new wing classrooms |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
Tackboard Done 2009
|
| Add tackable material to folding walls |
|
| Paint gym interior due to wall damage |
|
| Paint classroom interiors of older section of building |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Landscaping on south side for heat and noise control |
|
| Construct parking lot exit to Courtney Ave. |
Complete |
| Renovate and enlarge playground equipment area |
|
| Install underground irrigation system |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Renovate four older section rest rooms |
|
| Renovate the kitchen and cafeteria including flooring |
|
| Enlarge covered play area |
|
| Install folding bleachers in the gym |
|
| |
|
Back to Top
|
|
Riverside Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace all windows( west side is priority) |
|
| Replace 1977 roof over the south end of the building |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace both 1955 boilers |
Complete |
| Replace all classroom sinks |
|
| Replace fixtures in all rest rooms |
|
| Convert heating controls to direct digital system |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade and renovate lighting throughout |
|
| Replace 1980 intercom and clock system |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out flooring throughout entire building |
|
| Replace worn out chalkboards and tackboards |
|
| Provide acoustic treatment for older hallway ceilings |
|
| Replace doors and hardware on entire building |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Replace rotted wood siding on covered play area |
|
| Overlay all playground paving |
|
| |
|
Back to Top
|
|
View Acres Elementary
|
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Add sink and plumbing in staff room |
Complete |
| Convert heating controls to direct digital system |
Complete |
| Renovate library/tech center and add ventilation |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade and replace lighting throughout |
Complete |
| Replace 1982 intercom and clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
Complete |
| Add acoustic treatment to cafeteria walls |
Complete |
| Replace worn out tile floors throughout building |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Reconfigure parking lot for improved parent drop-off |
Complete |
| Replace rotted wood siding on covered play area |
Complete |
| Construct stairway to the lower play field. |
Complete |
| Renovate upper playground and add drainage |
Complete |
| Replace play structure/renovate play surface grounds |
Complete |
| Overlay and pave exit drive to Hill Road |
Complete |
| Renovate Hill road access to lower field |
Complete |
| Construct larger covered play area expansion |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Rest room finish renovationa nd upgrade |
Complete |
| Add skylights to three interior rooms |
Complete |
| Renovate/expand or reconfigure office area |
Scheduled for 2010
|
| Move technology room to room 19 and add power |
Complete |
| Renovate unused inner locker room to orchestra room |
Complete |
| |
|
Back to Top
|
|
CLACKAMAS HIGH ATTENDANCE AREA
|
|
Clackamas High School
|
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Upgrade ventilation system in the Art Room |
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Additional tackboards in all corridors and classrooms |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Install drainage on practice soccer and football fields |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Install stage lighting controls in black box theatre |
|
| |
|
Back to Top
|
|
Sunrise Middle School
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Paint the entire exterior of the building |
|
| Replace or renovate problem areas of building roof |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Convert heating controls to direct digital system |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Paint the entire interior of the building |
|
| Replace rusted toilet partitions throughout building |
|
| Replace worn out flooring in corridors and cafeteria |
Complete |
| Replace worn out flooring in all classrooms and offices |
|
| |
|
Back to Top
|
|
Clackamas Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace and renovate 1978 roof on main building |
Complete |
| Replace windows in the annex |
Complete |
| Repair bad stucco at front entrance |
Complete |
| Replace and renovate 1979 roof on annex building |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace heat/vent units and radiators - entire building |
Complete |
| Connect main building downspouts to storm drain |
Complete |
| Upgrade and replace steam traps throughout building |
Complete |
| Convert heating controls to direct digital system |
Complete |
| Replace all classroom sinks |
Complete |
| Ventilation improvements for main computer lab |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade site and entry lighting |
Complete |
| Renovate and upgrade lighting throughout |
Complete |
| Install underground electrical service |
Complete |
| Replace 1975 clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards/room & halls |
Complete |
| Replace window coverings throughout |
Complete |
| Paint the interior of the entire building |
Complete |
| Upgrade and repair exterior door hardware |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Renovate and improve parking around the building |
Complete |
| Replace deteriorated sidewalks around entire site |
Complete |
| Play area paving overlay |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Upgrade storage and shelving throughout school |
Complete |
| Construct small meeting room |
Complete |
| Renovate lower building rest rooms |
Complete |
| Renovate unused storage room to office/conf. space |
Complete |
| |
|
Back to Top
|
|
Scouters Mountain Elementary / Happy Valley Middle School
|
|
| Replace Happy Valley Elementary School |
Complete |
| Construct Happy Valley Middle School |
Complete |
| |
|
Back to Top
|
|
Mount Scott Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Repair all dry rotted windows |
Complete |
| Replace all exterior siding and paint the entire building |
Complete |
| Replace 1989 shingle roof and gutters |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace obsolete heat control system |
Complete |
| Replace 18 original 1989 classroom furnaces |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade lights to T-8 and electronic ballasts |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace rusted toilet partitions |
Complete |
| Paint the interior of the entire building |
Complete |
| Convert all chalkboards to dry marker boards |
Complete |
| Sand and seal the gym floor |
Complete |
| Replace deteriorating wood section of cafeteria floor |
Complete |
| Replace worn floor covering on stairwells and lower level |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Add drainage to play field |
Complete |
| Expand the covered play area |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Install TV wall mounts in all rooms |
Complete |
| Install volleyball standard system in the main gym |
Complete |
| |
|
Back to Top
|
|
Oregon Trail Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Repair and re-roof sections as needed. |
Complete |
| Replace leaking classroom doors |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace obsolete heat control system |
Complete |
| Improve ventilation to the computer center classroom |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Paint the interior of the entire building |
Complete |
| Sand and seal the gym floor |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Renovate and add drainage to playground area |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Expand the cafeteria, add computer lab and conf. room |
Complete |
| Incorporate conference room into future construction |
Complete |
| |
|
Back to Top
|
|
Spring Mountain Elementary
|
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Upgrade ventilation system controls |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Cover concrete stairs with rubber tread material |
Complete |
| Acoustic treatment for library, gym, cafeteria |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| |
|
Back to Top
|
|
Sunnyside Elementary
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Renovate and replace the 1974 Unit B roof area |
Complete |
| Replace Unit A windows |
Complete |
| Replace rotted vertical cedar siding on units C and D |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Convert heating controls to direct digital system |
Complete |
| Replace 1960 Unit B boiler |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade electric system in library and computer rooms |
Complete |
| Replace 1981 intercom and clock system |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
Complete |
| Paint the interior of the entire building |
Complete |
| Replace worn out floor covering in Unit B |
Complete |
| Sand and seal gym floor |
Complete |
| Renovate wall finish and fixtures unit A rest rooms |
Complete |
| Upgrade and repair exterior door hardware |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Overlay paving for all play areas |
Complete |
| Install drainage system on the play field |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Renovate rest room wall finishes in sectors B and C |
Complete |
| |
|
New School Facilties
|
|
| Construct Elementary Schools |
|
| Construct Elementary School |
|
|
| Construct Middle School |
|
| |
|
Back to Top
|
|
DISTRICT FACILITIES
|
|
Sojourner School/New Urban High School
|
|
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace all classrooms sinks/countertops |
|
| Repair and upgrade hallway drinking fountains |
|
| Install separate water heater for annex building |
|
| Relocate control compressor for noise abatement |
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Replace intercom and clock system |
|
| Upgrade fire alarm system |
|
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Replace worn out chalkboards and tackboards |
|
| Replace window coverings in all rooms |
|
| Repair and Upgrade hall way tackboard/display areas |
|
| Replace the floor in the mult-purpose room |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Upgrade and improve play area |
|
| Overlay pave the asphalt play area |
|
| Repair and upgrade west bus loading area |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Renovate rest room wall finishes and fixtures |
|
| Construct covered play area structure |
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Replace and renovate the 1978 roof |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Replace all worn out 1930's unit ventilators and radiators |
|
| Insulate steam pipes to annex building |
|
| Upgrade all water piping systems |
|
| Repair and replace all steam traps |
|
| Replace obsolete heat control system |
|
| Replace all rest room sinks and fixtures |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Pave and improve parking and loading areas |
|
| |
|
Back to Top
|
|
Sabin/Schellenberg - North
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Renovate exterior finish of all campus buildings |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Convert heating controls to direct digital system |
Complete |
| Replace all gas unit heaters |
Complete |
| Renovate heating systems in teen parent and Child Services |
Complete |
| Install oil/water separator in auto shop |
Complete |
| Renovate the greenhouse covers and heating system |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade and improve exterior site lighting |
Complete |
| Replace 1968 clock system |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Parking and bus driveway improvements |
Complete |
| Pave gravel parking and overlay all paved areas |
Complete |
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Renovate building to accommodate new/expanded programs |
Complete |
| Renovate all rest rooms |
Complete |
| |
|
Back to Top
|
|
Sabin/Schellenberg - South
|
|
| Building Envelope (roofing, siding, exterior painting, windows, etc.) |
|
| Paint the entire exterior of the building |
Complete |
| Mechanical Systems (heating, ventilating, air conditioning, plumbing, controls, etc.) |
|
| Convert heating controls to direct digital system |
Complete |
| Replace heat/vent units throughout the building |
Complete |
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Upgrade the fire alarm system to current code |
Complete |
| General Building Maintenance (ceilings, floors, structure, interior finishes) |
|
| Refinish all interior doors |
Complete |
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Pave and overlay all parking lots and paved areas |
Complete |
| Complete the connections to storm drain system |
Complete |
| |
|
Back to Top
|
|
Administration Building
|
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| 20,000 s.f. addition to consolidate facilities |
|
| |
|
Back to Top
|
|
Physical Plant Site
|
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| General renovation, parking and ADA improvements |
|
| |
|
Back to Top
|
|
Transportation Center
|
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| Replacement of Transportation Center |
|
| |
|
Back to Top
|
|
District Sports Facilities
|
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Clackamas High School Field Turf |
Complete |
| Milwaukie High School Field Turf/Track |
Complete |
| Rex Putnam High School Field Turf/Track |
Complete |
| |
|
| |
|
Back to Top
|
|
TECHNOLOGY
|
|
District Facilities and Sites
|
|
| Computers, Data Networking, communications |
|
| |
|
Back to Top
|
|
INFRASTRUCTURE
|
|
District Facilities and Sites
|
|
| Electrical Systems (power, lighting, communications, burglar and fire alarms) |
|
| Security System/Card Key - Districtwide |
|
| Fire alarm upgrade - Districtwide |
|
| MHS, Sabin, Sunrise, Rowe, Alder Creek, Campbell |
|
| Clackamas El, Concord, Lewelling, Linwood, Riverside |
|
| Sunnyside, View Acres, Whitcomb, Wichita |
|
| Alder Creek - Replace field lighting poles and underground service |
Complete |
| Upgrade clock and bell systems - district wide |
|
| Grounds and Site Improvements (paving, landscaping, site structures) |
|
| Install safety cushion on all elementary play equipment |
|
| District-wide anti-skateboarding measures |
|
| Facillity Improvements (major renovation and repair of aging facilties) |
|
| |
|
Back to Top
|
|
LAND PURCHASE
|
|
New School Facilties
|
|
| Six Properties - 80 to 100 acres of land: |
|
| Happy Valley School(s) Site |
Complete |
| New Elementary School Site |
Complete |
| New Elementary School Site |
Complete |
| New Middle School Site |
Complete |
| Future Vogel Site |
Complete |
| Future Site |
|