Work has been completed on all bond funded improvements. Work included: remodeling of kitchen, general upgrades in classrooms, new ceiling in covered play area, bleachers in the gym, fire and security alarm upgrades, restroom upgrades and site improvements.
| Capital Project Manager: |
Garry Kryszak, North Clackamas School District |
| Project Manager: |
Jon Sandstrom, J.J. Henri Co., Inc.
|
| Architect: |
Barrentine, Bates & Lee
|
- All bond funded work completed in September, 2009.
 |
 |
|
| Parking Lot 8/09 |
Play Area 8/09 |
Play Area 8/09 |
 |
 |
 |
| Patio 8/09 |
Kitchen 8/09 |
Kitchen 8/09 |
 |
 |
 |
Play Area 8/09
|
New Asphalt on Patio 8/09
|
Side Drive w/ Trench and Drain Pipe 7/09 |
 |
 |
 |
| Bathroom Tile 7/09 |
Replaced Patio 7/09 |
Play Area Concrete Replaced 7/09 |
 |
 |
 |
Stage Being Prepared for Curtain 7/09
|
Ceiling Work on Stage 7/09 |
Ceiling Work on Stage 7/09 |
 |
 |
 |
| Play Area 7/09 |
Patio Squares Removed 7/09 |
Kitchen 7/09 |
 |
 |
 |
| Kitchen 7/09 |
Old Drainage Pipes 7/09 |
|
 |
 |
 |
| Stage 7/09 |
Play Area 7/09 |
Play Area 7/09 |
 |
 |
 |
| Catch Basin 7/0 |
Classroom 7/09 |
Classroom 7/09 |
9 |
 |
 |
| Kitchen: Drain System and Grease Trap 7/09 |
Kitchen: Drain System and Grease Trap 7/09 |
Kitchen: Drain System and Grease Trap 7/09 |
 |
 |
 |
Furnace 7/09
|
Kitchen 7/09
|
Pipeline (front) 7/09
|

|

|

|
| Pipeline (front) 7/09 |
Pipeline (front) 7/09 |
Pipeline (side) 7/09 |
 |
 |
 |
| Pipeline (side) 7/09 |
Pipeline (side) 7/09 |
Covered Play Area 7/09 |
|