Whitcomb Elementary

 Last Updated on 9-30-09


PROJECT SUMMARY:
Work has been completed on all bond funded improvements.  Work included: remodeling of kitchen, general upgrades in classrooms, new ceiling in covered play area, bleachers in the gym, fire and security alarm upgrades, restroom upgrades and site improvements.

PROJECT TEAM:
Capital Project Manager:  Garry Kryszak, North Clackamas School District
 Project Manager:  Jon Sandstrom, J.J. Henri Co., Inc.
 Architect:  Barrentine, Bates & Lee

 
PROJECT SCHEDULE:
Construction Start: June 2009
 Completion Date: August 2009 

PROJECT SCHEDULE  


Upcoming Events:
  • All bond funded work completed in September, 2009.

PROJECT PHOTOS:
     
Parking Lot 8/09 Play Area 8/09 Play Area 8/09
Patio 8/09 Kitchen 8/09 Kitchen 8/09
 Play Area 8/09
 New Asphalt on Patio 8/09
Side Drive w/ Trench and Drain Pipe 7/09 
 
Bathroom Tile 7/09  Replaced Patio 7/09 Play Area Concrete Replaced 7/09
 Stage Being Prepared for Curtain 7/09
Ceiling  Work on Stage 7/09 Ceiling Work on Stage 7/09
Play Area 7/09 Patio Squares Removed 7/09 Kitchen 7/09
Kitchen 7/09  Old Drainage Pipes 7/09  
Stage 7/09 Play Area 7/09 Play Area 7/09
Catch Basin 7/0 Classroom 7/09 Classroom 7/09
9
Kitchen: Drain System and Grease Trap 7/09 Kitchen: Drain System and Grease Trap 7/09 Kitchen: Drain System and Grease Trap 7/09
Furnace 7/09
Kitchen 7/09
Pipeline (front) 7/09



Pipeline (front) 7/09 Pipeline (front) 7/09 Pipeline (side) 7/09
Pipeline (side) 7/09 Pipeline (side) 7/09 Covered Play Area 7/09